Now there are 4 A-arms and two push rods ready to be welded and heat treated. The sphericals locations will be bored out to after to allow for any distortion during heat treatment. The rod ends will come last.





I still need to make the upper mounting brackets or plates to allow for double shear on the bolts. After that it's upright / knuckle work. At the very least, when these are done it'll go a long way towards making me feel like I've had some real progress after such a long time.