I have an atlas mid rise 6000lb. lift.
We met our goal this weekend.
we are a total of 7 working days into this build, and having a blast. Incredibly well engineered.
John Drove the coupe today. I did a short live stream of it. on facebook.
we will be back at it on the 28th of this month for another 3 1/2 days.
weekend 3 list will be:
fit nose
fit the doors
and make open and close
fit inner and outer window nets
Fab seat mounts
finish wiring, Racepack, cool suit, defrosters, wipers, aux fuel pump, diff cooler
transponder,