Very Cool Parts

Visit our community sponsor

Thanks Thanks:  3
Likes Likes:  8
Results 1 to 40 of 259

Thread: 3/17/2018 complete date for my MK4......delivery by April! (Build Complete)

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. #1
    cv2065's Avatar
    Join Date
    Dec 2017
    Location
    Orlando, FL
    Posts
    1,868
    Post Thanks / Like
    Looks great Steve. How did you mount your CNC Resevoirs? I see 3 nuts at the top...are those rivnuts? Also, the pyramid piece that you have rivnutted behind it as access to the DS footbox. I'm guessing that's in the box of aluminum that I haven't gotten to just yet?
    MKIV Roadster - #9380 - Complete Kit - Delivered 7/17/18 - SOLD 5/2023
    Build Thread #1: https://thefactoryfiveforum.com/show...V-Build-Thread
    MKIV Roadster - #TBD - Complete Kit - Delivered 11/6/23 - In Progress
    Build Thread #2: https://thefactoryfiveforum.com/show...Build-Thread-2

  2. #2
    Senior Member
    Join Date
    Mar 2017
    Posts
    307
    Post Thanks / Like
    Quote Originally Posted by cv2065 View Post
    Looks great Steve. How did you mount your CNC Resevoirs? I see 3 nuts at the top...are those rivnuts? Also, the pyramid piece that you have rivnutted behind it as access to the DS footbox. I'm guessing that's in the box of aluminum that I haven't gotten to just yet?
    Hey CV,

    Those are rivnuts that I used for the Triple CNC, screwed up through the bottom of the rail. The triangle access panel is for after the foot box is closed up, when you need access to the foot box area. The master cylinders are in there and the balance bar so access is important for adjustment. If you are doing manual brakes.

    Enjoy your build!!!
    Build#1: MKIV Roadster #9320

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  

Breeze