BluePrint Engines

Visit our community sponsor

Thanks Thanks:  1
Likes Likes:  6
Results 1 to 19 of 19

Thread: DMV Inspection Tomorrow/ Cut and Buff Complete!!!

Threaded View

Previous Post Previous Post   Next Post Next Post
  1. #1
    Member JETAV8R's Avatar
    Join Date
    Apr 2018
    Location
    Wilson, NC
    Posts
    62
    Post Thanks / Like

    DMV Inspection Tomorrow/ Cut and Buff Complete!!!

    DMV inspection scheduled for tomorrow 1100. Hopefully it will go well and I will have paperwork in hand by 1200. Down to the little stuff now. Windwings, sunvisors, and front overriders. Just in time for spring!
    Last edited by JETAV8R; 03-26-2019 at 06:11 PM.
    MKIV Roadster #9414, Complete Kit Delivered 9/8/2018, First Start 11/9/2018, First Go Cart 11/10/2018, Ford 306 Hand Built, E303 Cam, Blueprint Engine Heads, Edelbrock Performer Manifold, Edelbrock AVS2 Carb, Roller Rockers, Tremec T5, 3.55 Moser 3 Link, 17" Halibrand Replicas, Nitto 555 G2's, Power Steering, Power Brakes, Heated Seats, Russ Thompson Turn Signal

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  

FFMetal

Visit our community sponsor