Visit our community sponsor
Thanks:
3
Likes:
3
-
firewall install feedback
i don't have the body yet as i purchased the stage 1 kit.
i tried to square up the firewall as best as possible. the upper and sides are equidistant from the frame.
there are however some gaps where the foot box lines up with the firewall
i wanted to see if anyone had advise before i drilled the sheet metal
i am planning to use 1/4" - 20 button head screws instead of rivets. i figured id rather spend time tapping than drilling out rivets
IMG_0225_LI.jpgIMG_0226_LI.jpgIMG_0228_LI.jpgIMG_0229_LI.jpgIMG_0230_LI.jpgIMG_0232_LI.jpgIMG_0233_LI.jpgIMG_0235_LI.jpgIMG_0242_LI.jpgIMG_0244_LI.jpg
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
-
Forum Rules
Visit our community sponsor