FormaCars

Visit our community sponsor

Thanks Thanks:  22
Likes Likes:  62
Page 3 of 5 FirstFirst 12345 LastLast
Results 81 to 120 of 190

Thread: North Florida 289 Build, #10306

  1. #81
    Senior Member Chainsaw's Avatar
    Join Date
    May 2020
    Location
    St. Johns, FL
    Posts
    223
    Post Thanks / Like
    Dash3.jpgDash2.jpgdash1.jpg
    Soooooo, I was working on installing the Russ Thompson turn signal hardware and opening up the steering shaft hole in the dash. After doing so, I realized that the FIA 289 dash won't work as it is cut from FFR. When centered on the pre-cut hole, the larger steering shaft hole makes the dash sit too high on the DS, such that the tach and left-most gauge won't fit under the hoop. The turn signal/high beam indicators are now sitting in the hoop. Also, the bezels for the gauges and the RT mod interfere, so I can't open up the hole any more in the vertical. The speedo fit was marginal with the hoop already, so I can't move that side up. At least part of this is on me, for sure, as I didn't imagine things would be this far out of whack.
    I can see where things need to move, so I'll be calling FFR for a blank dash here shortly. Yeehaw.
    Last edited by Chainsaw; 07-18-2022 at 11:15 AM.
    Jack
    289 Roadster complete kit ordered 8/2/21. Delivered 3/14/2022. Chassis #10306. 17"x9" Halibrands, 3.55 IRS, PS, Wilwood brakes, BPE 306 with EFI and close ratio TKX. First start 7/20/2023. First Movement 9/24/2023. First go-kart 9/25/2023.
    Build thread - https://thefactoryfiveforum.com/show...rida-289-Build

  2. #82
    Senior Member Chainsaw's Avatar
    Join Date
    May 2020
    Location
    St. Johns, FL
    Posts
    223
    Post Thanks / Like
    While I wait for brakes, other POL items, and the new blank dash, I did install the side panels for the trunk aluminum. Next week, I'll mount the modified tank vent charcoal filter and then move on to the trunk floor with the Breeze cubby and Russ Thompson drop trunk. I also must replace the front hubs as they're leaking (my fault). On a positive note, my side pipes showed up Wednesday.

    FFR doesn't sell cats for the 289 any longer. I assume if I buy some hi-flow cats, a competent muffler shop/weld shop can modify the current j-pipes or are there other options?
    Jack
    289 Roadster complete kit ordered 8/2/21. Delivered 3/14/2022. Chassis #10306. 17"x9" Halibrands, 3.55 IRS, PS, Wilwood brakes, BPE 306 with EFI and close ratio TKX. First start 7/20/2023. First Movement 9/24/2023. First go-kart 9/25/2023.
    Build thread - https://thefactoryfiveforum.com/show...rida-289-Build

  3. #83
    Senior Member
    Join Date
    Aug 2014
    Location
    Northern Virginia
    Posts
    212
    Post Thanks / Like
    I swear I saw a post a few years ago where someone got long tube headers with cats integrated from Mike Forte.

    Regarding the J pipes, shouldn't be too hard as that's all the once offered Factory five cats were (cat welded into a J pipe). If you go that route, you may want to wait until you have the body on so you perhaps the exhaust shop could adjust the J pipe angle on the passenger side as it will probably be a bit off.

    For reference, here's one of my cats (ordered from Factory five in 2014, then coated).

    FFR MKIV 8309, FMS 306 Crate w/Edelbrock EFI, T5, 3.55 Three Link, Wilwood Brakes

  4. Thanks Chainsaw thanked for this post
  5. #84
    Member Zach Bohn's Avatar
    Join Date
    Sep 2021
    Location
    SoCal
    Posts
    35
    Post Thanks / Like
    Would it work if you did not use the collar?

  6. #85
    Senior Member Chainsaw's Avatar
    Join Date
    May 2020
    Location
    St. Johns, FL
    Posts
    223
    Post Thanks / Like
    Been in Texas working the past week and making some $$ for parts. I hope to get back to the build this week. In my efforts to increase my knowledge of the 289 Roadster build, I may have discovered and/or proven I’m an idiot. More to follow.
    Jack
    289 Roadster complete kit ordered 8/2/21. Delivered 3/14/2022. Chassis #10306. 17"x9" Halibrands, 3.55 IRS, PS, Wilwood brakes, BPE 306 with EFI and close ratio TKX. First start 7/20/2023. First Movement 9/24/2023. First go-kart 9/25/2023.
    Build thread - https://thefactoryfiveforum.com/show...rida-289-Build

  7. #86
    Senior Member Chainsaw's Avatar
    Join Date
    May 2020
    Location
    St. Johns, FL
    Posts
    223
    Post Thanks / Like
    Okay. I’m not a total idiot, just a partial one. The dash still sits too high and I will need to build my own with the blank dash I received.

    I did get some work done on the trunk section and have the RT drop trunk installed.
    B12DB6BB-2523-4085-A101-61ACBBADAA92.jpg

    And in even better news, my Wilwood brakes arrived yesterday.
    07385381-611D-43DE-90A6-9FD656535A02.jpg
    Jack
    289 Roadster complete kit ordered 8/2/21. Delivered 3/14/2022. Chassis #10306. 17"x9" Halibrands, 3.55 IRS, PS, Wilwood brakes, BPE 306 with EFI and close ratio TKX. First start 7/20/2023. First Movement 9/24/2023. First go-kart 9/25/2023.
    Build thread - https://thefactoryfiveforum.com/show...rida-289-Build

  8. #87
    Senior Member Chainsaw's Avatar
    Join Date
    May 2020
    Location
    St. Johns, FL
    Posts
    223
    Post Thanks / Like
    Brakes on. Will hopefully fill and bleed the systems and get the emergency brake installed this coming week.
    F3B469A9-5DE9-448E-92F0-C863E3A64DCC.jpg106CC56F-1A58-426A-A5CE-55751AD21AFC.jpg1E932080-5217-4931-8B57-9942D7EA97F6.jpg00063D08-B528-47C6-B881-34A70A4A6185.jpg
    Jack
    289 Roadster complete kit ordered 8/2/21. Delivered 3/14/2022. Chassis #10306. 17"x9" Halibrands, 3.55 IRS, PS, Wilwood brakes, BPE 306 with EFI and close ratio TKX. First start 7/20/2023. First Movement 9/24/2023. First go-kart 9/25/2023.
    Build thread - https://thefactoryfiveforum.com/show...rida-289-Build

  9. #88
    Member
    Join Date
    Aug 2017
    Location
    Michigan
    Posts
    95
    Post Thanks / Like
    Looks like a lot of quality work going on with great parts. Enjoy!

  10. Thanks Chainsaw thanked for this post
  11. #89
    Senior Member Chainsaw's Avatar
    Join Date
    May 2020
    Location
    St. Johns, FL
    Posts
    223
    Post Thanks / Like
    Slow going with a lot of babysitting grandkids and work. I did get the Breeze cubby metal work done and got my wheels and other parts back from powder coating. I put the wheels on the car to see what they look like and to save storage space. I’m pretty happy with how it all turned out. For the record, the spinners will remain unpainted.
    804ABD28-FBF2-42D2-94CB-A9C068ECF4C3.jpg0364140D-6599-4045-9E0E-BE7F709D4FA3.jpgF4A67E27-253A-4230-AC73-94B945E4E5F5.jpg

    I’ll order my tires here shortly. I’m going with the Falken Azenis RT615K+ as they look like they’re a good compromise for local driving conditions and what I want to do with the car.
    Jack
    289 Roadster complete kit ordered 8/2/21. Delivered 3/14/2022. Chassis #10306. 17"x9" Halibrands, 3.55 IRS, PS, Wilwood brakes, BPE 306 with EFI and close ratio TKX. First start 7/20/2023. First Movement 9/24/2023. First go-kart 9/25/2023.
    Build thread - https://thefactoryfiveforum.com/show...rida-289-Build

  12. #90
    Senior Member Chainsaw's Avatar
    Join Date
    May 2020
    Location
    St. Johns, FL
    Posts
    223
    Post Thanks / Like
    Got the brakes bled using the old fashioned method with Mrs. Chainsaw assisting on the pedal.

    Got the elephant ears done with the fan blower installed and the 3” duct fitted and temp installed.
    19698DF7-D0EC-4281-B46B-FCA75D997A47.jpg647665DB-2BFE-41C8-9106-AD1C2F046645.jpg

    Cut the 1-3/4” hole for the RT turn signal mod and got the dash where I wanted it.
    48BFFBB5-3B56-4550-AD1B-FB0E8997099E.jpg

    I also temporarily installed one spinner just to see what it looked like. I’m happy with it.
    6EECE615-777C-47F1-9310-7671838683B3.jpg

    I’m going to cut the holes for the gauges today and start working on the dash.
    Jack
    289 Roadster complete kit ordered 8/2/21. Delivered 3/14/2022. Chassis #10306. 17"x9" Halibrands, 3.55 IRS, PS, Wilwood brakes, BPE 306 with EFI and close ratio TKX. First start 7/20/2023. First Movement 9/24/2023. First go-kart 9/25/2023.
    Build thread - https://thefactoryfiveforum.com/show...rida-289-Build

  13. #91
    Senior Member Chainsaw's Avatar
    Join Date
    May 2020
    Location
    St. Johns, FL
    Posts
    223
    Post Thanks / Like
    Need to get some pics up, but making slow progress. Dash and under dash filler panel drilled and fitted. DS foot box drilled and fitted. Awaiting vinyl from FFR, so I blew that off and ordered a roll from Amazon so I can skin the dash and move on with gauge/switch install. Mike D says they'll get my carpet done on the next cutting, so I hope to have that soon.

    Ordered more stuff from Breeze and cobraheat. My budget is so busted and beyond fixing. I'm glad the wife doesn't really ask anymore and that I still have side hustle $$ coming in so I don't have to dip into the retirement savings for this project. It's still cheaper to do things right or the way I want them done than doing things multiple times. (That only happens when I screw up which is too frequent.)

    BPE stuff probably won't be here until November at the earliest. I need the extra time to get ready for that delivery since I've been working a fair amount and then there's this TS/Hurricane Ian rolling up the coast now. I hope you guys in SW and central Florida are coming out okay.
    Last edited by Chainsaw; 09-29-2022 at 02:52 PM.
    Jack
    289 Roadster complete kit ordered 8/2/21. Delivered 3/14/2022. Chassis #10306. 17"x9" Halibrands, 3.55 IRS, PS, Wilwood brakes, BPE 306 with EFI and close ratio TKX. First start 7/20/2023. First Movement 9/24/2023. First go-kart 9/25/2023.
    Build thread - https://thefactoryfiveforum.com/show...rida-289-Build

  14. #92
    Senior Member Chainsaw's Avatar
    Join Date
    May 2020
    Location
    St. Johns, FL
    Posts
    223
    Post Thanks / Like
    Jack
    289 Roadster complete kit ordered 8/2/21. Delivered 3/14/2022. Chassis #10306. 17"x9" Halibrands, 3.55 IRS, PS, Wilwood brakes, BPE 306 with EFI and close ratio TKX. First start 7/20/2023. First Movement 9/24/2023. First go-kart 9/25/2023.
    Build thread - https://thefactoryfiveforum.com/show...rida-289-Build

  15. #93
    Senior Member Chainsaw's Avatar
    Join Date
    May 2020
    Location
    St. Johns, FL
    Posts
    223
    Post Thanks / Like
    Boring stuff, I know, but I think I’ve finally completed the emergency brake linkage. It seems to work, but I need to change out the rod end. The one I could find locally at Ace has a 5/16” ball with is really too big for the assembly. I have ordered a 1/4” rod end with an oversized 5/16-24 threaded section which will work on both ends of the linkage. I didn’t want to do this mod, but the cables were just too long to make the standard FFR hardware work with the modification to run them over the 4” tube.
    59EF15CB-D88F-4C83-93D2-7471EF575E41.jpgAF9B703A-19DC-48CE-B54C-21D85540E61B.jpg37BE659A-550A-408D-872B-612DB02AF469.jpg
    Last edited by Chainsaw; 10-04-2022 at 12:30 PM.
    Jack
    289 Roadster complete kit ordered 8/2/21. Delivered 3/14/2022. Chassis #10306. 17"x9" Halibrands, 3.55 IRS, PS, Wilwood brakes, BPE 306 with EFI and close ratio TKX. First start 7/20/2023. First Movement 9/24/2023. First go-kart 9/25/2023.
    Build thread - https://thefactoryfiveforum.com/show...rida-289-Build

  16. #94
    Senior Member Chainsaw's Avatar
    Join Date
    May 2020
    Location
    St. Johns, FL
    Posts
    223
    Post Thanks / Like
    Small progress, but I put the car on the ground. The seats are just sitting in the cockpit as it seems to be the best place to store them.

    B18C8F87-6E5B-4BDD-97D3-144C21202137.jpg

    Now I have a chassis dolly if anyone needs one in North FL or South GA.
    Jack
    289 Roadster complete kit ordered 8/2/21. Delivered 3/14/2022. Chassis #10306. 17"x9" Halibrands, 3.55 IRS, PS, Wilwood brakes, BPE 306 with EFI and close ratio TKX. First start 7/20/2023. First Movement 9/24/2023. First go-kart 9/25/2023.
    Build thread - https://thefactoryfiveforum.com/show...rida-289-Build

  17. Likes RFracer, cnutting, Rocket Rob liked this post
  18. #95
    mcwho's Avatar
    Join Date
    Feb 2011
    Location
    DeBary - Florida
    Posts
    541
    Post Thanks / Like
    Hello Neighbor,
    Im only about an hour south of you. Hows the build going?. Early on I decided on Power steering power brakes and hydralic clucth early on. . I am gettin no yuonger and made my decsions based on what I saw and expeienced in the build school.
    Baghdad Bob

    Complete Kit Delivered July 2010, serial @ 7287, Whitby Power Brakes, Whitby Tonneau, Power Steering w HEIDTS PS Valve, Hydralic clutch, 15" Wheels, BFG Tires, 331 stroker w Quick Fuel 650, RPM Heads, Air Gap Intake. IRS w 3.27, TKO-600. FFMETAL Firewall Forward, FFMETAL Dropped Battery Box in Trunk, Enlarged Passenger footbox, Breeze Cubby storage, Breeze Seat Brackets, Herbs Door Panels. Ford ruby red 12 coats.

  19. #96
    Senior Member Chainsaw's Avatar
    Join Date
    May 2020
    Location
    St. Johns, FL
    Posts
    223
    Post Thanks / Like
    Quote Originally Posted by mcwho View Post
    Hello Neighbor,
    Im only about an hour south of you. Hows the build going?. Early on I decided on Power steering power brakes and hydralic clucth early on. . I am gettin no yuonger and made my decsions based on what I saw and expeienced in the build school.
    It’s coming along pretty well. Just in a slow period right now while we’re babysitting some of the grandkids this week and we have trip next week. When we get back, I’ll get the dash skinned, gauges installed/wired/tested and start on the non-standard electrical wiring after that. I’ve got the PS and hydraulic clutch stuff ready to go for the engine/transmission installation when they arrive. I haven’t decided if I’m going to get the Heidt proportioning valve for the PS system, but I’m leaning that way.
    Just eating the elephant one bite at a time.
    Jack
    289 Roadster complete kit ordered 8/2/21. Delivered 3/14/2022. Chassis #10306. 17"x9" Halibrands, 3.55 IRS, PS, Wilwood brakes, BPE 306 with EFI and close ratio TKX. First start 7/20/2023. First Movement 9/24/2023. First go-kart 9/25/2023.
    Build thread - https://thefactoryfiveforum.com/show...rida-289-Build

  20. Likes Rocket Rob liked this post
  21. #97
    Senior Member Chainsaw's Avatar
    Join Date
    May 2020
    Location
    St. Johns, FL
    Posts
    223
    Post Thanks / Like
    Due to work and family, it’s been a while since I was able to work much on the car. I did get the radiator mounted today.
    94A220FB-7174-4486-9215-F705FBA082B6.jpg4B178F98-D540-4706-BC32-B1EB1F1E433E.jpg98A730B1-46E7-4EFC-A09A-C26BC19BD451.jpg
    Jack
    289 Roadster complete kit ordered 8/2/21. Delivered 3/14/2022. Chassis #10306. 17"x9" Halibrands, 3.55 IRS, PS, Wilwood brakes, BPE 306 with EFI and close ratio TKX. First start 7/20/2023. First Movement 9/24/2023. First go-kart 9/25/2023.
    Build thread - https://thefactoryfiveforum.com/show...rida-289-Build

  22. #98
    Senior Member Chainsaw's Avatar
    Join Date
    May 2020
    Location
    St. Johns, FL
    Posts
    223
    Post Thanks / Like
    Still working on the dash wiring. I did get word the engine/transmission are complete at BPE. I asked them to delay shipment a week as I’ll be out of town next week. I should have it here by Thanksgiving.
    Jack
    289 Roadster complete kit ordered 8/2/21. Delivered 3/14/2022. Chassis #10306. 17"x9" Halibrands, 3.55 IRS, PS, Wilwood brakes, BPE 306 with EFI and close ratio TKX. First start 7/20/2023. First Movement 9/24/2023. First go-kart 9/25/2023.
    Build thread - https://thefactoryfiveforum.com/show...rida-289-Build

  23. #99
    Senior Member cnutting's Avatar
    Join Date
    Sep 2015
    Location
    Beachside
    Posts
    574
    Post Thanks / Like
    Is that the Breeze radiator mount? I had clearance issues withe the body and had to mount it at a shallower angle than the suggested MKIV radiator angle. I talked it over with Mark at a show a couple years ago.
    FFR #8833 289 FIA 3-link
    1965 289, TKO600 from Forte's Parts Connection
    Body and Paint by Mike's Auto Restoration
    Picked up 3/5/2016, First start 4/22/2017, MA legal 7/11/2018
    Build Thread http://thefactoryfiveforum.com/showt...FIA-build-8833
    "Insanity is contagious" - Joseph Heller

  24. #100
    Senior Member Chainsaw's Avatar
    Join Date
    May 2020
    Location
    St. Johns, FL
    Posts
    223
    Post Thanks / Like
    It is the Breeze mount. What angle did you wind up with?
    Jack
    289 Roadster complete kit ordered 8/2/21. Delivered 3/14/2022. Chassis #10306. 17"x9" Halibrands, 3.55 IRS, PS, Wilwood brakes, BPE 306 with EFI and close ratio TKX. First start 7/20/2023. First Movement 9/24/2023. First go-kart 9/25/2023.
    Build thread - https://thefactoryfiveforum.com/show...rida-289-Build

  25. #101
    Ted G's Avatar
    Join Date
    Aug 2021
    Location
    El Dorado Hills, CA
    Posts
    762
    Post Thanks / Like
    Hey Jack,

    You might want to check the Breeze Cubby wall height. I had to cut mine down almost an inch as it was riding very high and lifted the rear of the body way too much. From your picture, it looks about an inch high. Not sure why, but I know this has been an issue with others too.

    Ted
    #10333 Complete Kit, Carbed 427w, TKX, IRS and many other upgrades

    • Order Date: September 11, 2021 - 20th Anniversary of 9/11
    • Delivery Day: April 1, 2022 - April Fool's Day
    • First Start and Go-Kart: January 20th, 2023
    • Graduation Date: July 4th, 2023 - Independence Day!!
    • Legal Registration Date: October 4, 2023 - My Birthday!!


    Visit my MKIV Build Thread (#10333)

  26. Thanks Chainsaw thanked for this post
  27. #102
    Senior Member cnutting's Avatar
    Join Date
    Sep 2015
    Location
    Beachside
    Posts
    574
    Post Thanks / Like
    I'll grab a photo tomorrow for you. Basically mounted the hinge to the top of the 3/4" tube.
    FFR #8833 289 FIA 3-link
    1965 289, TKO600 from Forte's Parts Connection
    Body and Paint by Mike's Auto Restoration
    Picked up 3/5/2016, First start 4/22/2017, MA legal 7/11/2018
    Build Thread http://thefactoryfiveforum.com/showt...FIA-build-8833
    "Insanity is contagious" - Joseph Heller

  28. Thanks Chainsaw thanked for this post
  29. #103
    Senior Member Chainsaw's Avatar
    Join Date
    May 2020
    Location
    St. Johns, FL
    Posts
    223
    Post Thanks / Like
    Quote Originally Posted by Ted G View Post
    Hey Jack,

    You might want to check the Breeze Cubby wall height. I had to cut mine down almost an inch as it was riding very high and lifted the rear of the body way too much. From your picture, it looks about an inch high. Not sure why, but I know this has been an issue with others too.

    Ted
    Thanks for that. I had seen that on Dan’s YouTube build videos, too. I just gave that area a look and you’re correct. I’ll have to cut it down some.
    Jack
    289 Roadster complete kit ordered 8/2/21. Delivered 3/14/2022. Chassis #10306. 17"x9" Halibrands, 3.55 IRS, PS, Wilwood brakes, BPE 306 with EFI and close ratio TKX. First start 7/20/2023. First Movement 9/24/2023. First go-kart 9/25/2023.
    Build thread - https://thefactoryfiveforum.com/show...rida-289-Build

  30. Likes Ted G liked this post
  31. #104
    Senior Member Chainsaw's Avatar
    Join Date
    May 2020
    Location
    St. Johns, FL
    Posts
    223
    Post Thanks / Like
    While getting my head right concerning with the harness wiring, I decided to work on the NRG/Russ Thompson turn signal mod. Things appear to come out pretty well, but not as pretty as most.

    DC656F39-E94D-407F-BFA9-DDBAE7E59CD6.jpg0F6530B1-7A14-4B82-A7B8-7F930F487787.jpg5CE481C0-0AFA-4CDC-A3CB-27D44847D32A.jpg

    I have found a problem. The NRG mechanism has always been difficult even when not installed. However, now that I’ve installed everything I can’t get the tabs to fulyl engage to lock the mechanism. The tabs start to engage, but I can only turn the collar about 1/4 of the way to full lock. Has anyone else experienced this?

    I don’t see any interferences and with the hub or wheel interfaces and all of the screw heads are countersunk with no interferences. I’m assuming the tabs are just a bit too thick. I’d prefer not to remove any tab material, but that’s my only path forward at this point. Any ideas?
    Jack
    289 Roadster complete kit ordered 8/2/21. Delivered 3/14/2022. Chassis #10306. 17"x9" Halibrands, 3.55 IRS, PS, Wilwood brakes, BPE 306 with EFI and close ratio TKX. First start 7/20/2023. First Movement 9/24/2023. First go-kart 9/25/2023.
    Build thread - https://thefactoryfiveforum.com/show...rida-289-Build

  32. #105
    Namrups's Avatar
    Join Date
    Sep 2021
    Location
    Mechanicville, NY
    Posts
    1,018
    Post Thanks / Like
    I lightly filed the tab material and added a thin layer of grease a little at a time until I got mine to engage. Go lightly as it doesn't take much.
    Scott Pregont
    Present build: 65 Daytona Coupe #393 - Forte 427 EFI crate w/TKX 2.87/ .81 - Ordered 11/16/21 - Delivered 6/23/2022
    Location: Mechanicville, NY
    Build Thread: https://thefactoryfiveforum.com/show...na-Coupe-build
    My Albums
    Special Tools, Custom Parts, misc supplies: https://thefactoryfiveforum.com/album.php?albumid=2045
    Garage Pics: https://thefactoryfiveforum.com/album.php?albumid=2041
    POR15 First Try: https://thefactoryfiveforum.com/album.php?albumid=2068
    Silicone application tips: https://thefactoryfiveforum.com/album.php?albumid=2063

  33. Thanks Chainsaw thanked for this post
  34. #106
    Senior Member Chainsaw's Avatar
    Join Date
    May 2020
    Location
    St. Johns, FL
    Posts
    223
    Post Thanks / Like
    I think I have the NRG mod working now. Took more filing that I thought, but I just did a little at a time and eventually got full engagement. I also built up my hood hinges (not installed yet) and added a bunch of electrical spade connectors to the dash wiring to make the power and instrumentation connections.

    Based upon my electrical adds, I decided to put in positive & ground bus bars. I’m waiting on those arriving, but I went fishing for the battery feed cable in the harness to see how accessible it was. Before I cut into that, is that the right cable to go after for an always-hot power input to the positive bus bar? Seems like a dumb question, but too important to get wrong.
    Jack
    289 Roadster complete kit ordered 8/2/21. Delivered 3/14/2022. Chassis #10306. 17"x9" Halibrands, 3.55 IRS, PS, Wilwood brakes, BPE 306 with EFI and close ratio TKX. First start 7/20/2023. First Movement 9/24/2023. First go-kart 9/25/2023.
    Build thread - https://thefactoryfiveforum.com/show...rida-289-Build

  35. #107
    Senior Member Chainsaw's Avatar
    Join Date
    May 2020
    Location
    St. Johns, FL
    Posts
    223
    Post Thanks / Like
    BPE delivery today. Everything seems to be in good order.
    F5602FA7-3E0A-4DA9-BAFA-D98448C3917A.jpg

    Dyno run info. 372 hp/365 lb-ft. It’ll definitely work for what I want out of this machine.
    7A508ED6-47EF-4295-B36A-6D445895DC71.jpg

    Silver Sport mid-shift kit on order. Should be a real treat installing that set up, but I’m looking forward to it.

    I’m still arguing with myself on the need to go ahead and install an adjustable fuel pressure reg or just use the Sniper’s reg.
    Last edited by Chainsaw; 11-22-2022 at 07:52 AM. Reason: Isssue with photos
    Jack
    289 Roadster complete kit ordered 8/2/21. Delivered 3/14/2022. Chassis #10306. 17"x9" Halibrands, 3.55 IRS, PS, Wilwood brakes, BPE 306 with EFI and close ratio TKX. First start 7/20/2023. First Movement 9/24/2023. First go-kart 9/25/2023.
    Build thread - https://thefactoryfiveforum.com/show...rida-289-Build

  36. Likes mach'er liked this post
  37. #108
    Ted G's Avatar
    Join Date
    Aug 2021
    Location
    El Dorado Hills, CA
    Posts
    762
    Post Thanks / Like
    Looking good!
    #10333 Complete Kit, Carbed 427w, TKX, IRS and many other upgrades

    • Order Date: September 11, 2021 - 20th Anniversary of 9/11
    • Delivery Day: April 1, 2022 - April Fool's Day
    • First Start and Go-Kart: January 20th, 2023
    • Graduation Date: July 4th, 2023 - Independence Day!!
    • Legal Registration Date: October 4, 2023 - My Birthday!!


    Visit my MKIV Build Thread (#10333)

  38. #109
    Senior Member Chainsaw's Avatar
    Join Date
    May 2020
    Location
    St. Johns, FL
    Posts
    223
    Post Thanks / Like
    Quote Originally Posted by Chainsaw View Post
    Thanks for that. I had seen that on Dan’s YouTube build videos, too. I just gave that area a look and you’re correct. I’ll have to cut it down some.
    I pulled the bulb seal off and put a level on the 2 bulkheads. The Breeze bulkhead is just a smidge higher than the cockpit bulkhead assuming total leveling which I probably shouldn’t. However, eyeballing the 2 bulkheads they are very close to even. Should the cubby bulkhead be lower?
    5D580723-B914-461C-9A1D-A3BD0BAAD049.jpg
    Jack
    289 Roadster complete kit ordered 8/2/21. Delivered 3/14/2022. Chassis #10306. 17"x9" Halibrands, 3.55 IRS, PS, Wilwood brakes, BPE 306 with EFI and close ratio TKX. First start 7/20/2023. First Movement 9/24/2023. First go-kart 9/25/2023.
    Build thread - https://thefactoryfiveforum.com/show...rida-289-Build

  39. #110
    Senior Member Chainsaw's Avatar
    Join Date
    May 2020
    Location
    St. Johns, FL
    Posts
    223
    Post Thanks / Like
    So, I still haven’t decided on which fuel pressure regulator to use. Has anyone had any bad luck with the Holley Sniper regulator that’s already part of the system?
    I plan to dump the Sniper system sometime in the not-too-distant future for the Edelbrock ProFlow 4 or, if I hit the lottery, the Inglese 8-stack system. This makes me think I should go ahead and install the adjustable regulator from Mike Forte.
    Decisions, decisions.
    Jack
    289 Roadster complete kit ordered 8/2/21. Delivered 3/14/2022. Chassis #10306. 17"x9" Halibrands, 3.55 IRS, PS, Wilwood brakes, BPE 306 with EFI and close ratio TKX. First start 7/20/2023. First Movement 9/24/2023. First go-kart 9/25/2023.
    Build thread - https://thefactoryfiveforum.com/show...rida-289-Build

  40. #111
    Senior Member zee's Avatar
    Join Date
    Dec 2021
    Posts
    301
    Post Thanks / Like
    Quote Originally Posted by Chainsaw View Post
    I pulled the bulb seal off and put a level on the 2 bulkheads. The Breeze bulkhead is just a smidge higher than the cockpit bulkhead assuming total leveling which I probably shouldn’t. However, eyeballing the 2 bulkheads they are very close to even. Should the cubby bulkhead be lower?
    5D580723-B914-461C-9A1D-A3BD0BAAD049.jpg
    I'd love to see if someone has a photo of what the level should actually be.
    Complete novice who doesn't know what he's doing.
    MKIV with BPE 347 & TKX. IRS. A crap ton of mods.
    Build thread

  41. #112
    Member
    Join Date
    Jan 2022
    Location
    Seattle, WA
    Posts
    39
    Post Thanks / Like
    Quote Originally Posted by Chainsaw View Post
    I pulled the bulb seal off and put a level on the 2 bulkheads. The Breeze bulkhead is just a smidge higher than the cockpit bulkhead assuming total leveling which I probably shouldn’t. However, eyeballing the 2 bulkheads they are very close to even. Should the cubby bulkhead be lower?
    5D580723-B914-461C-9A1D-A3BD0BAAD049.jpg
    My 289 kit was delivered a couple weeks ago. I haven't removed my body from the chassis yet and have a Breeze bulkhead that I ordered. I tried a test fit and it will definitely need to be cut down. My plan was to measure the clearance and cut it now to make sure it fits so I don't have a problem when I put the body back on later. I'm guessing it will need to be cut down .5-.75" to have clearance for the bulb seal. It looks pretty uniform across the span but will confirm dimensions tonight.

  42. Likes zee liked this post
  43. #113
    Senior Member DW66's Avatar
    Join Date
    Jan 2020
    Location
    Plymouth Mass
    Posts
    123
    Post Thanks / Like
    I made mine removable. Makes things easier to reach in the long run. You can trim it to fit after the body is on. Comes out easily to mount and adjust the seat belts.00-awJGrm4PbKMN9_k3MmQbYwiEQlFtDi43g4WJZSh0XqeebujlO91CFuyLtE49dmZ-4xJ2Twu75QF_jizMkB1ZdA.jpg
    MK4 Complete kit FFR9939. Gen 1 Coyote, Tremec 3650, IRS 3.31 ratio, Breeze radiator stuff, Breeze cubby and battery mount, North Race Cars heat and A/C, RT drop trunk kit, Replica Parts radiator aluminum and brake booster spacer, FFR soft top.

  44. Thanks Chainsaw thanked for this post
  45. #114
    Member
    Join Date
    Jan 2022
    Location
    Seattle, WA
    Posts
    39
    Post Thanks / Like
    Quote Originally Posted by lasse2 View Post
    My 289 kit was delivered a couple weeks ago. I haven't removed my body from the chassis yet and have a Breeze bulkhead that I ordered. I tried a test fit and it will definitely need to be cut down. My plan was to measure the clearance and cut it now to make sure it fits so I don't have a problem when I put the body back on later. I'm guessing it will need to be cut down .5-.75" to have clearance for the bulb seal. It looks pretty uniform across the span but will confirm dimensions tonight.
    For what it's worth, I was able to measure the clearance for a bulkhead on my 289 kit. I used a point 11" back from the rear of the cockpit as noted in the Breeze instructions. On each side, from top of trunk aluminum to the underside of the fiberglass I have 7 1/2". In the center I have 9 15/16". This would require that approximately 1/4" be trimmed from the top arc of the bulkhead just to stand vertically. Additional clearance will be needed for the bulb seal.
    Lars
    Novice Build: 289 USRRC Complete Kit #10524, 3rd Gen Coyote, TKX, IRS, 17" Halibrands, Wilwood Brakes, Power Steering

  46. Thanks zee thanked for this post
  47. #115
    Senior Member Chainsaw's Avatar
    Join Date
    May 2020
    Location
    St. Johns, FL
    Posts
    223
    Post Thanks / Like
    Slow going lately with the holidays, grand kid invasions, and colds, but making some progress with a lot of grunt work. Got the wiper motor, Hyperspark CD box, and fuel pressure regulator mounted, added insulation to the back of the firewall, and been sealing up some of the panel gaps in preparation for adding cockpit insulation. I’ve also been working some wiring stuff and got my TKX front shift mod done. I need to test out the electrical system, gauges, etc., this week and then I hope to install the engine/transmission.
    6CD4BFC9-AA34-4288-B6C1-552C6F725777.jpg9014F090-2D29-48D4-865F-E8B53EFC5D22.jpg
    Jack
    289 Roadster complete kit ordered 8/2/21. Delivered 3/14/2022. Chassis #10306. 17"x9" Halibrands, 3.55 IRS, PS, Wilwood brakes, BPE 306 with EFI and close ratio TKX. First start 7/20/2023. First Movement 9/24/2023. First go-kart 9/25/2023.
    Build thread - https://thefactoryfiveforum.com/show...rida-289-Build

  48. #116
    Senior Member Chainsaw's Avatar
    Join Date
    May 2020
    Location
    St. Johns, FL
    Posts
    223
    Post Thanks / Like
    Got the new stick hardware in from Silver Sport. The TKX still appears to shift with the mod (good news). I think it will look good, too. Ready to get the dash connected up so I can get the final length wires done, add 2 more connectors and then test what I can.
    1F405408-9378-4ED5-9987-DEEBD75EDC7B.jpg582D01CA-72D2-4C41-A936-D3A388618628.jpg
    Jack
    289 Roadster complete kit ordered 8/2/21. Delivered 3/14/2022. Chassis #10306. 17"x9" Halibrands, 3.55 IRS, PS, Wilwood brakes, BPE 306 with EFI and close ratio TKX. First start 7/20/2023. First Movement 9/24/2023. First go-kart 9/25/2023.
    Build thread - https://thefactoryfiveforum.com/show...rida-289-Build

  49. #117
    Senior Member Chainsaw's Avatar
    Join Date
    May 2020
    Location
    St. Johns, FL
    Posts
    223
    Post Thanks / Like
    Still grindin’. Made 2 fuel hoses and attached fittings to test fit to the fuel reg. I still need to pressure test these 2 hoses. Worked on and installed the firewall extension.
    C2F44FAF-A6D1-4E9B-B851-EE54C79C3AF9.jpgA9B3C412-7981-4881-9565-9DA6F152601E.jpg1FB799AE-63A8-435C-B6CD-BF11318AD2CA.jpg

    My goal is to install the engine/transmission next week and sort out the location to install the Hyperspark coil. I may wind up installing it on the DS foot box or way over to the driver’s side of the firewall. Need to avoid the mech throttle linkage in either case.
    Last edited by Chainsaw; 01-12-2023 at 07:16 PM. Reason: Added stuff.
    Jack
    289 Roadster complete kit ordered 8/2/21. Delivered 3/14/2022. Chassis #10306. 17"x9" Halibrands, 3.55 IRS, PS, Wilwood brakes, BPE 306 with EFI and close ratio TKX. First start 7/20/2023. First Movement 9/24/2023. First go-kart 9/25/2023.
    Build thread - https://thefactoryfiveforum.com/show...rida-289-Build

  50. #118
    Senior Member Chainsaw's Avatar
    Join Date
    May 2020
    Location
    St. Johns, FL
    Posts
    223
    Post Thanks / Like
    Big day today. Got the engine/transmission dropped in and bolted up. No too bad for 3 guys that had not done this before. I got the transmission a-frame installed, too. Had to cut the tunnel crossmember to get the shifter in place. Need to fill the transmission with fluid.
    D70843A1-28A8-4C29-ABC2-50AFDC062B35.jpg36CFEF8E-265B-48FB-87BF-3ED4A3621A81.jpg

    On to hooking all of the engine stuff up, fitting the mechanical throttle linkage, and finishing the dash wiring and testing it. Break-in oil on the way. Headers on back-order, but ordered.
    Jack
    289 Roadster complete kit ordered 8/2/21. Delivered 3/14/2022. Chassis #10306. 17"x9" Halibrands, 3.55 IRS, PS, Wilwood brakes, BPE 306 with EFI and close ratio TKX. First start 7/20/2023. First Movement 9/24/2023. First go-kart 9/25/2023.
    Build thread - https://thefactoryfiveforum.com/show...rida-289-Build

  51. Likes Salty Chief 35, Fman, jbs72697 liked this post
  52. #119
    Senior Member Chainsaw's Avatar
    Join Date
    May 2020
    Location
    St. Johns, FL
    Posts
    223
    Post Thanks / Like
    Driveshaft installed. Need to set the pinion angle next.
    3FA6FBAB-ACFC-4F45-87C3-4D77E84D6395.jpg
    Jack
    289 Roadster complete kit ordered 8/2/21. Delivered 3/14/2022. Chassis #10306. 17"x9" Halibrands, 3.55 IRS, PS, Wilwood brakes, BPE 306 with EFI and close ratio TKX. First start 7/20/2023. First Movement 9/24/2023. First go-kart 9/25/2023.
    Build thread - https://thefactoryfiveforum.com/show...rida-289-Build

  53. #120
    Senior Member Chainsaw's Avatar
    Join Date
    May 2020
    Location
    St. Johns, FL
    Posts
    223
    Post Thanks / Like
    Jack
    289 Roadster complete kit ordered 8/2/21. Delivered 3/14/2022. Chassis #10306. 17"x9" Halibrands, 3.55 IRS, PS, Wilwood brakes, BPE 306 with EFI and close ratio TKX. First start 7/20/2023. First Movement 9/24/2023. First go-kart 9/25/2023.
    Build thread - https://thefactoryfiveforum.com/show...rida-289-Build

  54. Likes RFracer liked this post
Page 3 of 5 FirstFirst 12345 LastLast

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  

Breeze

Visit our community sponsor