-
Senior Member
Copy all. I've seen the pix from guys who've gone to Spotlight. Top-notch stuff. Just doing my due diligence on someone local. Mr. Kleiner is also on my short list, but IN is a haul.
I'll give Mike at Spotlight a call. 11 months out should work pretty well for my current build pace.
And I'll probably be calling Mr BadAsp427 for a transport as well if he's still doing that in 11 months.
Jack
289 Roadster complete kit ordered 8/2/21. Delivered 3/14/2022. Chassis #10306. 17"x9" Halibrands, 3.55 IRS, PS, Wilwood brakes, BPE 306 with EFI and close ratio TKX. First start 7/20/2023. First Movement 9/24/2023. First go-kart 9/25/2023.
Build thread -
https://thefactoryfiveforum.com/show...rida-289-Build
-
Originally Posted by
Chainsaw
Copy all. I've seen the pix from guys who've gone to Spotlight. Top-notch stuff. Just doing my due diligence on someone local. Mr. Kleiner is also on my short list, but IN is a haul.
I'll give Mike at Spotlight a call. 11 months out should work pretty well for my current build pace.
And I'll probably be calling Mr BadAsp427 for a transport as well if he's still doing that in 11 months.
Well that sounds good... regardless of where you go... :=)
-
Post Thanks / Like - 0 Thanks, 1 Likes