Hello,

I'm about ready to put the body on (pre painting and body work) so I can do some go karting farther from home and get it trailered for painting and body work.

I have a Gen 3, ball flange headers from FFR, and GAS-N side pipes.

How do I align the side pipe hangers (where to drill on chassis) if I don't know where the body will be aligned in its final position? Or maybe I can support the side pipes some other way in the mean time with the body on?

Thank you!