July 2013:
I got the steering rack & pinion along with the associated steering shafts, knuckles, etc. installed and working. Also put together the Grill/radiator/fan assy, added one of Mike's radiator shrouds. My wheels finally arrived from FFR about the 2nd week in July, I put BF Goodrich tires on them. I think it was about this time I got in on the group buy for a Boyd's tank and my grand daughter was visiting from SC. she wants a ride as soon as it's done. One more thing, the E-brake mechanism; I had all of the little pieces powder coated before assembly, putting this together was one of the more enjoyable parts of the build so far.
pictures attached: