Ditto. I had about 1/4" space between the floor and the footbox pieces. I jacked them up using a 2x4 and drilled the rivet holes. Then I gooped them with the marine adhesive, jacked them back up and 3/16 riveted them. 4 on each side.
Visit our community sponsor
Ditto. I had about 1/4" space between the floor and the footbox pieces. I jacked them up using a 2x4 and drilled the rivet holes. Then I gooped them with the marine adhesive, jacked them back up and 3/16 riveted them. 4 on each side.
33 Hot Rod Stage 1, Gen.2 ordered 11/11/2021 started June 12, 2022, LS3 E-Rod crate engine, Tremec TKX, 8.8 WITH 3.55 Ratio and limited slip with 31 spline axles.17X8 and18x10 Race Star wheels wrapped in Conti Extreme contact DWS tires, Mustang Cobra brakes all around. Electric PS and AC. Hard top, electric windows and bike fenders. First Start 5/31/2023. Go-Kart 6/2/2023.