Visit our community sponsor
Thanks:
1
Likes:
3
-
Senior Member
Well the front firewall is fully riveted (and all panels painted, which took well over 12 hours to do - our hope is to prevent aluminum corrosion, so they are still painted aluminum color. A lot of work for not much visual difference now! lol), one dead pedal is in (waiting on a 2nd one for the driver side, with idea of reinforcing it), steering rack and steering column are on (we can steer!!!!), and pedal box is in (going to install the gas pedal tomorrow). Our piston rings are also due tomorrow.
We are at 63.5 hours of work since we picked up our kit (15 hours on engine, 48.5 on build). We also just passed $6k in parts sales from the donor car! The only parts we are directly replacing that we sold are the pistons and turbo ($500), so far (headers, up-pipe, rods, etc. are still for sale as all of those will be new in this build).
For mounting the master cylinder, we did as others on the forum and shaved the bolt heads so they would fit. We also switched to 1.5" long bolts rather than the provided 1" ones:
Steering wheel and pedals!
-
Senior Member
Originally Posted by
Tamra
Steering wheel and pedals!
Did yours come with the reinforced metal piece for the brakes and steering column? If so when and how does that attach. Was I supposed to put it on before the firewall?
-
Senior Member
Originally Posted by
R.Spec
Did yours come with the reinforced metal piece for the brakes and steering column? If so when and how does that attach. Was I supposed to put it on before the firewall?
Yes, there's a separate bracket now for the pedals.. This needs to be bolted in place before the contoured front aluminum. IIRC it goes on with some of the low pan head socket cap screws. 1/4-20 maybe?
I think it's actually properly updated in the I rev manual.
-
Senior Member
Originally Posted by
xxguitarist
Yes, there's a separate bracket now for the pedals.. This needs to be bolted in place before the contoured front aluminum. IIRC it goes on with some of the low pan head socket cap screws. 1/4-20 maybe?
I think it's actually properly updated in the I rev manual.
Forgive me for asking again. But after I got it all bolted up with the 5 screws. the pedal box is not even close to lining up. The master cylinder screws go through and the part that attaches to the steering column lines up. but the bolt holes that go through the firewall are not even close? Input on this?
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
-
Forum Rules
Visit our community sponsor