Visit our community sponsor
Thanks:
39
Likes:
91
-
Senior Member
Nothing too noteworthy to post since my last update as my time to work on the car has been limited, but I did manage to get a solid 6 hours this past Saturday to begin fitting and drilling panels. I managed to get both F panels, DS and PS footboxes, firewall, and trans tunnel front vertical wall positioned and drilled (see below). Work will continue this week on the cockpit floors and hopefully finish all fitment/drilling by the end of next week. I still need to pick up an aluminum sheet to fabricate the two upper trunk side walls and possibly a piece along the back trunk wall (still TBD). I also made a trip to FFMetals to pick-up one of their trans tunnel covers as I plan to do a mid-shift and have no interest in having an uneven surface with aluminum patches. It's a nice a high quality piece and Bill's a great guy. Spent a solid 45 minutes talking shop, sharing tips/tricks, etc.
MKIV Complete Kit #9494 l Delivered 1/5/19 l First Start
11/28/20 l First Go-kart
4/11/21 l Carb'd 347 l Mid-shift TKO600 l 3.55 IRS l P/S l Forte Mechanical Throttle Linkage l RT Turn Signal, Drop Trunk l Breeze Upper/Lower Radiator Support, Fan Shroud l Boig Upper/Lower Cool Tubes & Quiet Pipes l 18" FFR Gasser Wheels l
Build Thread
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
-
Forum Rules
Visit our community sponsor