Kids on our street gave me the above name because I was always working in the garage.

I first posted on the Roadster page as “ I’m joining the club” Figured I should move over here and do some updates.
Kit was ready to ship July 27th, she was delivered two weeks later on August 8th.
My configuration is , IRS, powder coated, cut outs, Coyote, leather seats. blank dash, Power steering, heater, 17” halibrands, sun visors and wind wings.

Front suspension installed and rack centered per Karlos. I need to remove the shocks and check the rebound damping. All rivet holes drilled for front sheet metal.
Front Driver.jpg
58837496093__D58FFA49-5567-4EB9-9D62-7BFDAB211AC5.JPG

Optional jungle gym for grand kids
Jungle gym.jpg

IRS installed, waiting for back ordered calipers. That pumpkin is heavy and awkward.
IRS Pass.jpg

I was never warned by forum members on how many band aids I would need.

As she sits today.
Full picture.jpg